Pool Closing Checklist
  • Pumping down the pool water level to below the jets/returns
  • Evacuation of all water from plumbing and filtration equipment
  • Winterize filtration equipment (pump, filter, chemical feeder, heater)
  • Removal of lights, fittings and deck equipment
  • Seal all plumbing poolside
  • Check salt cell (if applicable)
  • Super chlorination to leave a bank of chlorine in the water
  • Apply a dose of algaecide to leave a bank in the water
  • Installation of winter pool cover and placement of water bags (if applicable)




More online client services than any other Pool/Spa Dealer

Discover Now